Two Js Metalwork

This is the first phase of steelwork to a large residential property in Surrey. The galvanised steelwork shown is to support a gabion basket wall.

Phase 2 consists of 214 members equating to 30 Tonne of structural steelwork. This will be installed in the new year.

Two J’s Metalwork really like to get their teeth stuck into a multi-phased project such as this. It really gives us the opportunity to promote what we do well and create a base for something amazing.

Want to work with us?

If you are looking for a bespoke steel framework for any style of building such as this, then Two J’s Metalwork would love to chat with you further. This particular job was in Surrey, but we work throughout KentHampshireSurrey, Essex & South London, as well as West and East Sussex.

Please contact us on 01825 732782 if you would like to make an enquiry for a project such as this.

Call Two Js Metalwork